
The Tenant Improvements at West Tasman Drive – Phase 2 consisted of renovating four existing buildings, approximately 435,000 square-feet total.
PROJECT VALUE: $15 million
LOCATION: San Jose, CA
SCOPE: Electrical BIM Modeling development (LOD 350), Coordination for the purpose of clash detection/resolution, and Production of Shop Drawings and Point Layout Drawings, As-Built updates (Update of model to reflect as built conditions).