The SLC Terminal Redevelopment Program project includes the expansion and modernization of the current Salt Lake City Airport terminals and concourses. This includes a new 909,000-square-feet terminal and two new concourses. Both linear structures will be located north of the terminal.
PROJECT VALUE: $4.1 billion
LOCATION: Salt Lake City, UT
GC: Holder Construction Group LLC
SCOPE: Electrical BIM Modeling development (LOD 350), Coordination for clash detection/resolution, and Production of Shop Drawings and Point Layout Drawings; As-Built updates