Metro Crenshaw/LAX Line will travel 8.5 miles offering an alternative transportation option to congested roadways. The line is an 8.5-mile extension consisting of at grade, below grade, and aerial sections.
Architect: HNTB and Arup
Cost:  $1.76 billion
Location:  Los Angeles, CA
General Contractor:  Walsh-Shea Corridor Constructors (WSCC)
Scope: 3D Modeling of all electrical systems; MEP Clash coordination;  Shop drawings for all electrical systems

Project Details

  • Category:   Transportation
  • Client: Date: December 10, 2014