Metro Crenshaw/LAX Line will travel 8.5 miles offering an alternative transportation option to congested roadways. The line is an 8.5-mile extension consisting of at grade, below grade, and aerial sections.
Architect: HNTB and Arup
Cost: $1.76 billion
Location: Los Angeles, CA
General Contractor: Walsh-Shea Corridor Constructors (WSCC)
Scope: 3D Modeling of all electrical systems; MEP Clash coordination; Shop drawings for all electrical systems
Project Details
- Category: Transportation
- Client: Date: December 10, 2014