The Tenant Improvements at West Tasman Drive – Phase 2 consisted of renovating four existing buildings, approximately 435,000 square-feet total.

PROJECT VALUE: $15 million

LOCATION: San Jose, CA

GC: Rosendin Electric Inc

SCOPE: Electrical BIM Modeling development (LOD 350), Coordination for the purpose of clash detection/resolution, and Production of Shop Drawings and Point Layout Drawings, As-Built updates (Update of model to reflect as built conditions)

Are you looking for assistance with a project like this? Visit our website or schedule a call for more information.