The Architecture, Engineering and Construction (AEC) industries have long sought techniques to decrease project cost, increase productivity and quality, and reduce project delivery time.
Through the years, I have seen the BIM construction industry move towards the prefabrication process. It has profoundly influenced BIM and the way we think of construction.
Traditional installation of electrical rooms in Data Centers takes at least 6 months, owing to the dependency of equipment placement first before we install racks and conduits.